Construction Updates Newsletter


Posted Date:08/06/2021
Contact Email:jeckhart@ci.neenah.wi.us


Department of Public Works
211 Walnut St. · P.O. Box 426 · Neenah WI 54957-0426
Phone 920-886-6240 · e-mail: publicworks@ci.neenah.wi.us

2021 STREET CONSTRUCTION UPDATES
AUGUST 9 – AUGUST 13
AUGUST 16 – AUGUST 20
Winneconne Av
(Commercial - Washington)

Washington Av
(Commercial - Winneconne)

Olive St
The contractor is scheduled to complete storm sewer construction and continue water main construction. The contractor will start house-side sewer and water service replacement.

All Streets, including Winneconne Avenue, will be closed to through traffic.

The contractor is scheduled to continue house-side sewer and water service replacement.
Fairview AvThe contractor is scheduled to finish grading the roadway and place string-line in preparation for paving the south half of the street.

Driveway access to homes on the south side of the street will be restricted from the point that the string-line is placed until the concrete has cured.

The contractor is scheduled to pave the south half of the street.

Driveway access to homes on the south side of the street will be restricted from the point that the string-line is placed until the concrete has cured.

Laudan Blvd
(Congress - S. Park)
The contractor is scheduled to do several small utility structure repairs. No work is scheduled.
Marathon Av
(Bell - Peckham)
The contractor is scheduled to place string-line in preparation for paving the east half of the street.

Driveway access to homes on the east side of the street will be restricted from the point that the string-line is placed until the concrete has cured. Pavement gaps will be provided at intersections.
The contractor is scheduled to pave the east half of the street.


Driveway access to homes on the east side of the street will be restricted from the point that the string-line is placed until the concrete has cured. Pavement gaps will be provided at intersections.
Isabella St
(Winneconne-Sherry)
The contractor is scheduled to start house-side sewer and water service replacement. The contractor is scheduled to continue house-side sewer and water service replacement.

Notes: 1) This schedule could vary depending on site conditions and weather.

2) Please contact the Department of Public Works at 920-886-6240 if you have any questions or concerns during the construction project, especially related to safety.

3) Our inspector and/or the contractor will be contacting customers prior to connecting the new water services, which will require a water service interruption. We will work to make the connection during a time that is convenient for the customers and the contractor.